| Putting
the Floor into the Cabin October 2000 Holes where dug allowing for the placement of 4 hydraulic jacks at each corner. The cabin was slowly raised and blocked to a height where a floor could be built underneath. After the floor was finished the cabin was lowered down onto the finished floor. |
|
![]() |
![]() |
![]() |
![]() |
![]() |
|